5/3/2010 - Chalkville Road

Chalkville Road was recently resurfaced, and due to excessive rain before the asphalt was cured, soft spots developed that would affect the longevity of the road surface.  The contractor came back and dug out these areas and patched them under the warranty.  In approximately a month, a 1" overlay will be applied so that there will be a smooth surface.

<-- Go Back